![]() The Fire Alarm System – Including but not limited to the fire control panel, annunciators, and initiating and supervisory devices shall be of an approved typed and shall be installed in accordance with the provisions of the Massachusetts State Building Code and NFPA 72.įire Protection Construction Documents – When the Massachusetts State Building Code requires a fire alarm system Fire Protection Construction Documents shall show the location and number of all alarm initiating devices, alarm notification appliances, proposed zoning, and a complete sequence of operation for the system. (The form is also available on the “I” drive. ![]() If an existing fire detection / suppression system is to be replaced or modified, the appropriate project manager or shop supervisor shall make the Amherst Fire Department aware of such modification by completing and submitting, as soon as practical the “Fire Alarm System Upgrade Notification” form enclosed.It is the responsibility of the appropriate project manager, during a preconstruction design review with Amherst Fire Department, and/or shop to verify correct design, placement and testing of the fire detection system before the college accepts the building or part there-of. Thunderstorm (Lightning and Thunder) Protocols.Keefe Campus Center Fire Pit Procedures.Fire Detection and Suppression System Impairment Policy.Fire Detection and Suppression Guidelines.Fire Alarm and Sprinkler Systems Work Permit.Construction and General Industry Safety.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |